1.ÒÆ¶¯Ê½Æ¤´øÔËÊä»úÔËת×÷ҵǰ£¬£¬£¬£¬£¬Ó¦½«ÐÐ×ßÂÖÓÃÈý½Çľ¶Ô³ÆÐ¨½ô¡£¡£¡£¡£¡£Àο¿Ê½Æ¤´øÔËÊä»ú£¬£¬£¬£¬£¬Ó¦×°ÖÃÔÚÀο¿µÄ»ù´¡ÉÏ¡£¡£¡£¡£¡£
2.Æð¶¯Ç°£¬£¬£¬£¬£¬µ÷½âºÃ°ì¼õËÙÕâËɽô¶È£¬£¬£¬£¬£¬´ø¿ÛÓ¦Àο¿£¬£¬£¬£¬£¬Öá³Ð¡¢³ÝÂÖ¡¢Á´ÌõµÈ´«¶¯²¿¼þÓ¦ÓÅÒ죬£¬£¬£¬£¬ÍÐÂֺͷÀ»¤×°ÖÃÓ¦ÆëÈ«£¬£¬£¬£¬£¬µçÆ÷½ÓµØ(½ÓÁã)±£»£»£»£»£»¤ÓÅÒ죬£¬£¬£¬£¬ÔËËÍ´øÓë¹öͲ¿í¶ÈÓ¦Ò»Ö¡£¡£¡£¡£¡£
3.Ó¦ÏÈ¿ÕÔØÆð¶¯£¬£¬£¬£¬£¬´ýÔËתÕý³£ºó£¬£¬£¬£¬£¬·½¿ÉÔȳÆ×°ÁÏ£¬£¬£¬£¬£¬²»µÃÏÈ×°ÁϺóÆð¶¯¡£¡£¡£¡£¡£
4.×÷ÒµÖУ¬£¬£¬£¬£¬Ó¦ËæÊ±×¢ÖØ»úеµÄÔËתÇéÐÎÈç·¢Ã÷ÔËËÍ´øÓÐËɳۻò×߯«Õ÷Ï󣬣¬£¬£¬£¬Ó¦Í£³µ¾ÙÐе÷½â»òÐÞÀí¡£¡£¡£¡£¡£ÑϽûÔÚÔËתÖоÙÐÐÐÞÀíºÍµ÷½â¡£¡£¡£¡£¡£
5.×÷ҵʱ£¬£¬£¬£¬£¬ÑϽûÈκÎÖ°Ô±´ÓƤ´øÔËÊä»úÏÂÃæ´©¹ý»ò¿çÔ½ÔËËÍ´ø¡£¡£¡£¡£¡£ÔËËÍ´ø´ò»¬Ê±£¬£¬£¬£¬£¬²»µÃÓÃÊÖ²ü¶¶À¶¯¡£¡£¡£¡£¡£
6.ÔËËÍ´ó¿éÎïÁÏʱ£¬£¬£¬£¬£¬ÔËËÍ´øÁ½²àÓ¦¼Ó×°µµ°å»òÕ¤À¸µÈ·À»¤×°Öᣡ£¡£¡£¡£
7.ÔËתÖÐÐèҪͣ»£»£»£»£»úʱ£¬£¬£¬£¬£¬Ó¦ÏÈ×èÖ¹×°ÁÏ£¬£¬£¬£¬£¬´ýÔËËÍ´øÉÏÁÏж¾¡ºó£¬£¬£¬£¬£¬·½¿ÉÍ£»£»£»£»£»ú¡£¡£¡£¡£¡£
8.ÓöµçԴͻȻÖÐÖ¹»òÆäËüÔµ¹ÊÔÓÉͻȻͣ³µ£¬£¬£¬£¬£¬Ó¦Á¬Ã¦ÇжϵçÔ´£¬£¬£¬£¬£¬È»ºó½«Æ¤´øÉϵÄÎïÁÏɨ³ýµô£¬£¬£¬£¬£¬µÈÀ´µç»òɨ³ý¹ÊÕϺ󣬣¬£¬£¬£¬ÔÙ½ÓͨµçÔ´Æô¶¯ÔËת¡£¡£¡£¡£¡£
9.Í£³µÇ°±ØÐèÏÈÓëÓйط½ÃæÁªÏµ£¬£¬£¬£¬£¬´ýÔËËÍ´øÉϵÄÎïÁÏÍêȫжµôºó£¬£¬£¬£¬£¬·½¿ÉÍ£»£»£»£»£»ú¡£¡£¡£¡£¡£
10.Í£»£»£»£»£»úºóÓ¦ÇжϵçÔ´£¬£¬£¬£¬£¬ËøºÃµçÔ´¿ª¹ØÏ䣬£¬£¬£¬£¬¶Ô»úе¸÷²¿¾ÙÐб£Ñø¡£¡£¡£¡£¡£Ó÷ÀÓ껤ÕÖ½«µçÄîÍ·¸ÇºÃ¡£¡£¡£¡£¡£
ÖÐÒëÓ¢£º
1 mobile belt conveyor running before the work, should the walking wheel with wooden triangle symmetric wedge. Fixed belt conveyer, should be installed on a solid basis.
2 before starting, adjustment of the tightness of the easy reduction, buckle should be firm, bearing, gear, chain and other transmission parts should be good, the supporting wheel and the protective device should be complete, electrical grounding ( zero) to protect the good, the belt and the roller width should be consistent.
3 first no-load starting, to be in normal operation, can be uniformly charging, not to charge after starting.
4 work, should always pay attention to mechanical running condition such as found in conveyor with relaxation or off phenomenon, should stop adjustment or repair. Is strictly prohibited in the operation for repair and adjustment.
5 operations, and forbids any personnel from the belt conveyor below through or across the conveyor belt. The conveying belt, not to hand shake pulling.
6 conveyor bulk materials, two sides of the conveyer should install baffles or fence protective device.
7 operation need to stop, should stop charging, stay on the conveyor belt after discharge, before shutdown.
8 in the event of power supply is suddenly broken or other causes of sudden stop, should be immediately cut off the power supply, then the belt material removed, such as call or after troubleshooting, and then turn on the power supply to start running.
9 parking must be concerned with relation to the conveyor belt, the material is fully unloaded, before shutdown.
10 stops should be cut off the power supply, power lock switch box, the Department of mechanical maintenance. Rainproof cover for motor cover.
(ͼ/ÎÄwww.changrong-jx.com)
|